Building
Afghanistan's
Future, Together.
A nationally registered construction and material production company. Innovation for growth. Building the future.
Two Decades of Excellence in Construction
Company Overview
Golden City Construction Company (GCC) is a non-government, non-political nationally registered construction and material production company established in 2002.
Group Structure
GCC Group operates under several affiliated companies including Groundbuilders and STANIKZAI Logistic. These family-owned companies all operate under one unified management structure.
Track Record
Over its 24-year history, GCC has delivered millions of USD worth of construction and road-building projects across Afghanistan, contributing to national recovery and sustainable development.
Vision
To bring stability, economic prosperity, and sustainable life to Afghan communities through excellence in construction.
Mission
To actively rehabilitate infrastructure and develop the private sector using professional engineering standards and best practices.
Overarching Goal
To contribute to national rehabilitation and private sector growth through quality construction, training, and consultancy services.
Key Objectives
Alleviate human suffering, rebuild critical infrastructure — buildings, roads, water systems — and coordinate with partner and donor organizations.
Manpower
Qualified and experienced engineering and construction staff with deep domain expertise.
Operations
Committed to quality control, standard procedures, competitive wages, and the use of quality materials.
Finance
Managed by a capable finance department with a focus on transparency, timely tax payments, and external audits.
Our Services
Comprehensive construction and engineering solutions — delivered with precision, on schedule, and within budget.
Residential
Single-family homes, multi-unit housing, and complete community developments.
Commercial
Office buildings, retail spaces, warehouses, and industrial facilities.
Roads & Bridges
Highway construction, urban roads, drainage systems, and bridge infrastructure.
Water & Sanitation
Water supply systems, wells, sewage networks, and treatment facilities.
Electrical
Power distribution networks, solar installations, and building electrical systems.
Material Production
Concrete, aggregates, asphalt, and brick manufacturing for construction supply.
QC & Safety
Quality control, occupational health & safety, and environmental compliance.
Consulting
Engineering design, feasibility studies, project management, and supervision.
Completed Projects
| Project Name | Client / Donor | Location | Start | End | Year |
|---|---|---|---|---|---|
| Construction of Stanikzai Mena Phase 1 (300 Houses) | GCC Self-Fund | Rahman Mena | 2011 | 2014 | 2011 |
| Construction of Stanikzai Mena Phase 2 (300 Houses) | GCC Self-Fund | Rahman Mena | 2011 | 2015 | 2011 |
| Construction of Stanikzai Mena Phase 3 (300 Houses, School, Clinic & Mosque) | GCC Self-Fund | Rahman Mena | 2012 | 2015 | 2012 |
| Construction of Golden City Mena Phase 1 | GCC Self-Fund | Rahman Mena | 2011 | 2014 | 2011 |
| Construction of Golden City Mena Phase 2 | GCC Self-Fund | Rahman Mena | — | — | — |
| Construction of Public School Golden City | Self Fund | Kabul | 10-Jul-06 | 10-May-08 | 2006 |
| Phase C Construction of 5 Blocks Golden City | Self Fund | Kabul | 1-Oct-06 | 15-Dec-08 | 2006 |
| Septic Tank for Golden City Site | Self Fund | Kabul | 1-Mar-05 | 30-May-05 | 2005 |
| Road Construction Golden City Project | Self Fund | Kabul | 1-Mar-04 | 15-Jul-04 | 2004 |
| Phase B Construction of 7 Blocks Golden City | Self Fund | Kabul | 1-Apr-04 | 30-Sep-08 | 2004 |
| Phase A Construction of 16 Villas (4 Floors) Golden City | Self Fund | Kabul | 1-Sep-04 | 30-May-06 | 2004 |
Equipment & Machinery
| Equipment / Machinery | Made In | Capacity | Qty |
|---|---|---|---|
| Wheel Excavator | Hitachi | EX 140 W | 1 |
| Excavator Chain | Hitachi | EX 200 W | 1 |
| Wheel Loader | Sanny | Eqv. 966 | 1 |
| Grader | Caterpillar | Eqv. 605 | 1 |
| Vibratory Roller | Dinapac | 25 Ton | 1 |
| Bulldozer | — | D85 | 1 |
| Crane | Hino | 8 Ton | 1 |
| Water Tanker | Mercedes Benz | 35,000 Ltr | 2 |
| Dump Truck | Mercedes Benz | 25 Ton | 2 |
| Dump Truck | Kamaz | 20 Ton | 2 |
| Flat Truck | Mercedes Benz | 25 Ton | 2 |
| Flat Truck | Dyana | 5 Ton | 2 |
| Tractor | Bella Russ | 75 HP | 1 |
| Well Boring Machine | China-Pakistan | 24 HP 16" | 2 |
| Well Boring Machine | China-Pakistan | 24 HP 8" | 3 |
| Air Compressor | Pakistan | — | 1 |
| Mobile Concrete Mixers | Pakistan | One Bag | 3 |
| Rod Vibrator | China | — | 5 |
| Compactor | China | — | 5 |
| Power Generator | Locally Assembled | 15 KVA | 5 |
| Power Generator | China | 5 KVA | 5 |
| Power Generator | China | 2.5 KVA | 6 |
| Welding Unit | Pakistan | — | 2 |
| CMU Molding Machine | Pakistan | — | 3 |
| Shuttering | Local | — | 12,000 m² |
Management & Team
A unified management structure that brings together experienced professionals across engineering, finance, and operations.
Management Dept.
Engineering Dept.
Finance Dept.
Senior Management
| Name | Position | Specialization | Institution | Experience |
|---|---|---|---|---|
| Mohammad Shafiq | General Manager | MBA | Peshawar, Pakistan | 12 Years |
| Mohammad Wahid Wahidi | Project Director | MBA | Kabul University | 15 Years |
| Eng. M Dawood Walakzai | CEO Projects | Engineering | Kabul Poly University | 15 Years |
| Ahmad Jawad Tamkin | Finance Manager | BBA | Poly Takhnic, Kabul | 05 Years |
Technical Staff
| Name | Position | Specialization | Institution | Experience |
|---|---|---|---|---|
| Shah Jahan Nesrat | Geo Technical Specialist | Civil Engineer | Dawat-ul-Jehad | 16 Years |
| Eng Shafiq Tariq | Operation Manager | Civil Engineer | Nangarhar University | 10 Years |
| Eng Mohammad Rafi | Construction Manager | Civil Engineer | Kabul University | 08 Years |
| Eng Mohammad Yonas | Quality Control Manager | Civil Engineer | Poly Technic Kabul | 08 Years |
| Eng Hasibullah Andalib | Quality Control Manager | Civil Engineer | Poly Technic Kabul | 08 Years |
| Eng M Khalid Naimi | Civil Surveying Engineer | Civil Engineer | Poly Technic Kabul | 08 Years |
What Clients Say
Two decades of partnerships built on trust, quality, and reliable delivery.
"GCC Group has consistently delivered high-quality construction projects on time and within budget. Their engineering expertise and local knowledge have been invaluable to our mission in Afghanistan."
"Working with Golden City Construction has been a model partnership. They bring professionalism, modern equipment, and a dedicated workforce to every site — even in the most challenging environments."
"Their commitment to quality control and safety is exemplary. GCC has built a strong reputation as one of Afghanistan's most reliable contractors across residential, commercial, and infrastructure sectors."
Our Donors & Partners
GCC has been privileged to work with a wide range of international donors and partner organizations over the years, contributing to Afghanistan's recovery and development across multiple sectors.
Quality, Safety & Compliance
Rigorous quality control and comprehensive safety protocols — protecting our people and delivering excellence.
QC Policy
- Never compromise fundamental quality or safety in construction
- Achieve workmanship set by contract requirements and Federal standards
- Consistent approach from conceptualization through turnover
QC Structure
- GCC Project Manager — oversees all contract requirements
- QC Program Manager — implements quality system firm-wide
- Site QC Staff — daily inspections, test plans, RFIs, reports
- Site Safety & Health Officer — accident prevention, PPE compliance
Regulations Followed
- Management of Health & Safety at Work Regulations 1992
- Manual Handling Operations Regulations 1992
- Workplace Regulations 1992 — neat and clean environments
- Personal Protective Equipment Regulations 1992
- HSE standards — factories, agriculture, railways & airports
PPE Provided to All Staff
- Safety helmets (white for engineers)
- Safety glasses / black goggles
- Protective gloves and safety boots
- High-visibility vests on all active sites
| Type of Injury | Office Compensation | Site Compensation | Remarks |
|---|---|---|---|
| Breaks (Leg or Hand) | $70 | $100 | Support for recovery period |
| Minor Cuts | $20 | $25 | First aid treatment |
| Serious Cuts / Lacerations | $300 | $400 | Requiring advanced medical care |
| Loss of Limb or Eye | $500 | $600 | Permanent disability support |
| Fatality | $1,000 | $1,200 | Family support benefit |
Contact Us
Have a project in mind? Let's discuss how GCC Group can bring your vision to life.
HEAD OFFICE
Kabul, Afghanistan